Installation Info


All of our equipment is delivered to site on our own Hi-ab lorries and our drivers are fully trained for Hi-ab operation, slinging and off loading operations. We provide full risk assessments, COSHH assessments, method statements and a lifting plan if required.
Before our operatives begin installation, a full survey of the hoarding line is conducted using Cat scanning equipment to ensure that no services will be struck once drilling / excavation commences. This is part of our costs and is carried out as part of our duty of care.
There are several ways of installing the hoarding, depending on the type of existing ground.